________
________
Information from some sites may not be reliable, or may not be vetted.
Some sources may require subscription.
________
from Miami Herald
"Ava Rose Olsen is 7 years old. Human beings of that age ask pointed questions. And the one she posed to Trump was a whopper: “'I hate guns. One took my best friend. I don’t want that to ever happen again. Are you going to keep kids safe?'”
________
from RealClearWorld
Media/News Company: international partner of RealClearPolitics
A New U.S. Defense Strategy for the Future
The Pentagon’s new National Defense Strategy articulated a profound shift in U.S. strategy, but one that has long been underway: Great power competition, not terrorism, is now the primary focus of U.S. national security.
A New U.S. Defense Strategy for the Future
The Pentagon’s new National Defense Strategy articulated a profound shift in U.S. strategy, but one that has long been underway: Great power competition, not terrorism, is now the primary focus of U.S. national security.
________
from The Spokesman-Review
Newspaper in Spokane, Washington
EWU plans major expansion into Spokane’s University District as anchor tenant of Avista’s planned 150,000-square-foot Catalyst building
Eastern Washington University plans to move three degree programs and around 1,000 students from its Cheney campus to a building along East Sprague Avenue – a major expansion of EWU’s footprint in Spokane’s University District that will allow for more growth in its science and engineering departments. Construction of the five-story, 150,000-square-foot “Catalyst” building is scheduled to begin in September, with completion expected in April 2020. The building will rise on a 5.5-acre lot at the south landing of the U-District pedestrian bridge being built over the wide rail corridor that cuts through the area. The lot is owned by Avista Development, a subsidiary of Avista Corp
________
EWU plans major expansion into Spokane’s University District as anchor tenant of Avista’s planned 150,000-square-foot Catalyst building
Eastern Washington University plans to move three degree programs and around 1,000 students from its Cheney campus to a building along East Sprague Avenue – a major expansion of EWU’s footprint in Spokane’s University District that will allow for more growth in its science and engineering departments. Construction of the five-story, 150,000-square-foot “Catalyst” building is scheduled to begin in September, with completion expected in April 2020. The building will rise on a 5.5-acre lot at the south landing of the U-District pedestrian bridge being built over the wide rail corridor that cuts through the area. The lot is owned by Avista Development, a subsidiary of Avista Corp
________
No comments:
Post a Comment